Wonder Track Technology

  • Patent-Pending
  • Save up to 2/3 construction compared to other systems
  • ‘Glue in the road’ rails. Proven use in Sheffield UK since 1996. ​
  • Installation does not require road closures with only single lane work site. 
  • Two tracks of up to 300 feet can be installed in a single week.
  • Our tracks require only about 5% excavation as compared to other track systems. Under street pant left in place.
  • (a) Shallow road recesses. 0nly 8 inches deep by 16 inch wide.
  • (b) Precast beams glued into road. ​
  • (c) Rails glued into beams​ 
  • Protected rails need low maintenance ​
  • Quicker build, minimal disruption and lower total cost of ownership.​
  • Underground utilities are not impacted.
  • Verified independently by AMEC, Carillion and lrishenco

Embedded Rail Track Flyer

Wonder Tram Installation Animation