Wonder Track Technology
- Patent-Pending
- Save up to 2/3 construction compared to other systems
- ‘Glue in the road’ rails. Proven use in Sheffield UK since 1996.
- Installation does not require road closures with only single lane work site.
- Two tracks of up to 300 feet can be installed in a single week.
- Our tracks require only about 5% excavation as compared to other track systems. Under street pant left in place.
- (a) Shallow road recesses. 0nly 8 inches deep by 16 inch wide.
- (b) Precast beams glued into road.
- (c) Rails glued into beams
- Protected rails need low maintenance
- Quicker build, minimal disruption and lower total cost of ownership.
- Underground utilities are not impacted.
- Verified independently by AMEC, Carillion and lrishenco